Mills-Peninsula Medical Center Cath Lab II
Scroll
Healthcare Construction Manager

Sutter Health –
Mills-Peninsula Medical Center Cath Lab II

A highly technical cardiac catheterization laboratory expansion demanding precision coordination across all medical and structural systems.

Client
Sutter Health
Location
Burlingame, CA
Year Completed
2025
Building Area
12,500 ft²
Delivery Method
Construction Manager

Project Overview

Delivering excellence
through integrated expertise

A comprehensive healthcare facility built through Construction Manager delivery, this project demonstrates Seven.Fact Construction's commitment to precision, sustainability, and client-focused outcomes. Our integrated team worked alongside the client's operational staff from day one to ensure every design decision served both clinical efficiency and the long-term adaptability of the building.

"

The Seven.Fact team brought genuine partnership to every phase of this project — their expertise and transparency made all the difference.

— Director of Facilities, Sutter Health

Approach & Execution

Navigating complexity with precision

Delivering this complex project within the established schedule and budget required creative logistics planning, extensive use of our Virtual Design & Construction platform, and close coordination with the client's facilities team throughout every phase of construction.

  • Integrated Team Approach

    Design and construction teams worked in parallel from day one, collapsing the traditional sequential process and enabling faster decisions with greater certainty.

  • Virtual Design & Construction

    Full BIM coordination across all trades eliminated field conflicts before construction began, protecting schedule integrity and reducing costly change orders.

  • Prefabrication & Modular

    Off-site fabrication of MEP assemblies and headwall units accelerated installation by weeks while improving quality consistency across repetitive spaces.

Services Delivered

Full-spectrum delivery
from concept to certificate

Construction Manager
Preconstruction
Virtual Design & Construction
Prefabrication & Modular
Self-Perform Trades
Sustainable Practices

Project Outcomes

Delivered on time,
above expectations

Completed 2025, the project was delivered on time and within the guaranteed maximum price. The facility has since exceeded initial utilization projections and has become a model for future projects within the client's portfolio.